The challenge: Existing buildings are responsible for one third of CO₂ emissions in Germany and are therefore a key lever for achieving the climate targets. By 2045, around three quarters of the 22 mi
ABSCHLUSSBERICHT: dena-Netzstudie III More information This was the challenge: Our energy grids for electricity, gas, hydrogen and, on a local level, for heat bring energy supply and demand together.
The challenge: The global energy transition requires international consensus and coordinated action. Investments in sustainable energy systems and an even stronger commitment on the path to climate ne
The project “System transformation for an optimised integration of renewable energies in Ukraine” was carried out by dena with support of Elia Grid International (EGI) and iC consulenten (iC). The pro
This is the challenge Reaching carbon neutrality by 2060 is an ambitious goal by the world’s largest economy. Energy supply in China still mainly relies on coal, with wind and solar accounting for onl
The challenge Germany has set itself ambitious goals for climate protection and energy efficiency. The energy supply must be shifted towards renewable energies to the greatest extent possible, and at
The expansion of renewable energies and the resulting gain in fluctuating power input are increasing the need for more flexibility in the electric power system. One option for providing more flexibili
Städte und Kommunen müssen sich nicht nur ihrer Verantwortung in Bezug auf die Klimakrise und den damit verbundenen Umweltveränderungen stellen, sondern auch ihr Potenzial als Hebelpunkt im Kampf gege
To support China’s Greater Bay Area in shifting towards a low-carbon and resource-efficient buildings and construction sector, dena committed to developing a Regional Roadmap for this sector. The Road
Die dena-Netzstudie III hat in einem breiten Stakeholderdialog gemeinsam mit Netzbetreibern, Energiewirtschaft, verantwortlichen Behörden, Politik und Zivilgesellschaft seit Ende 2018 den Bedarf und d